News:
4/25: Assignemnt 5 out, due in CS 347 on 5/11 (Thursday).
Date | Topic | Readings | Notes |
---|---|---|---|
Jan 23 (Mon) | Course introduction, class logistics | ||
Jan 25 (Wed) | Probability review - 1 |
AoS 1.1 - 1.6 MHB 3.1 - 3.5 |
|
Jan 30 (Mon) | Probability review - 2 |
AoS 1.7 MHB 3.6, 3.10 - 3.11 |
|
Feb 01 (Wed) | Random variables - 1 |
AoS 2.1 - 2.3 MHB 3.7 - 3.9 |
assignment 1 out |
Feb 06 (Mon) | Random variables - 2 |
AoS 2.4 MHB 3.7 - 3.9, 3.14.1 |
MATLAB scripts: draw_Bernoulli, draw_Binomial, draw_Geometric, sample_Bernoulli, sample_Binomial, sample_Geometric |
Feb 08 (Wed) | Random variables - 3 |
AoS 2.7 MHB 3.14.1, 3.10, 3.13 |
MATLAB scripts: draw_Uniform, draw_Exponential, draw_Normal, sample_Uniform, sample_Exponential, sample_Normal |
Feb 13 (Mon) | Conditioning and Expectations |
AoS 2.8 MHB 3.11 - 3.12, 3.15 |
|
Feb 15 (Wed) | Probability inequalities, Stochastic processes, Markov chains |
AoS 4.1 - 4.2, 23.1 - 23.3 MHB 3.14.2, 8.1 - 8.7 |
assignment 1 due assignment 2 out |
Feb 20 (Mon) | Non-parametric inference - 1 | AoS 6.1 - 6.2, 7.1 - 7.2 |
MATLAB scripts: draw_ecdf_random, draw_ecdf_normal, draw_ecdf_exponential |
Feb 22 (Wed) | Non-parametric inference - 2 | AoS 20.2 |
MATLAB scripts: draw_histogram_random, draw_histogram_normal |
Feb 27 (Mon) | Non-parametric inference - 3 Confidence intervals |
AoS 20.3, 6.3.2, 7.1 |
MATLAB scripts: draw_kde |
Mar 01 (Wed) | Parametric inference - 1 | AoS 6.3.1 - 6.3.2, 9.1 - 9.2 | assignment 2 due |
Mar 06 (Mon) | Mid-term 1 | ||
Mar 08 (Wed) | Parametric inference - 2 | AoS 9.3 - 9.4, 9.9 | assignment 3 out Required data file for Q8. |
Mar 13 (Mon) | Spring break | No class | |
Mar 15 (Wed) | Spring break | No class | |
Mar 20 (Mon) | Hypothesis testing - 1 | AoS 10 - 10.1, 10.10.2 | |
Mar 22 (Wed) | Project discussion - 1 | Finalize project dataset. Meet in CS 220. |
|
Mar 27 (Mon) | Hypothesis testing - 2 | AoS 10.2, 10.5 | assignment 3 due assignment 4 out Required data: q5_sigma3.dat, q5_sigma100.dat, q7_X.dat, q7_Y.dat. |
Mar 29 (Wed) | Bayesian inference | AoS 11.1 - 11.2, 11.7 | |
Apr 03 (Mon) | Statistical Models | ||
Apr 05 (Wed) | Project discussion - 2 | Finalize project deliverables. | |
Apr 10 (Mon) | Mid-term prep | No class. assignment 4 due |
|
Apr 12 (Wed) | Mid-term 2 | ||
Apr 17 (Mon) | Regression | ||
Apr 19 (Wed) | Time series analysis | ||
Apr 24 (Mon) | Project discussion - 3 | Mid-project review. | |
Apr 26 (Wed) | Classification | assignment 5 out.
Required data: q2.dat, q4.dat, q5.dat. |
|
May 01 (Mon) | Clustering | ||
May 03 (Wed) | Project prep | ||
May 08 (Mon) | Project final ppts | ||
May 10 (Wed) | Project final ppts |