AMS 553 / CET 554 / CSE 529 / MBA 553                                                                                                                                                                    Fall 2008

Assignment 4


Due Wednesday, November 12th.




AMS 553 / CET 554 / MBA 553 :

Textbook,  p. 171  ( p. 186 in the 3rd. edition ) ,    Problem 2.19.

Simulate the system for 10 independent replications. Collect point estimates and confidence intervals at the 95% confidence level (or better - see below) for the following performance metrics :

  1. Mean time that a ship spends in the harbour.

  2. Probability that an arriving ship does not have to wait for a berth. Note that this is similar to the situation of Example 9.16,  p. 496 ( p. 507 in the 3rd. edition ), of the textbook (and not that of Example 9.21,  p. 506 ;  p. 517 in the 3rd. edition). I shall be discussing this further in class.

  3. Average utilization of a berth (not of each berth separately as stated in the problem).

  4. Average utilization of crane.

Also report the min min time and max max time for ships in the harbour across the 10 runs.


Notes:


Hand-in

You should submit your source code using the  electronic hand-in  procedure provided.